military experts
EnglishРусский中文(简体)FrançaisEspañol
Set as default language
 Edit Translation

The frigate "Admiral Gorshkov" passed the procedure for restoring technical readiness at the Kronstadt Marine Plant

Frigate «Admiral Gorshkov» passed the procedure for restoring technical readiness at the Kronstadt Marine PlantHead frigate project 22350 “Admiral Gorshkov” passed the procedure for restoring technical readiness and is currently preparing to perform combat training tasks as part of the Northern Fleet. This was announced by a source in the Russian defense industry..

According to the source, the frigate was restored to technical readiness at the Kronstadt Marine Plant, deadlines for the completion of the work have not been announced., but 23 November, the ship fired an anti-aircraft missile system “Poliment-Redoute” at one of the sea ranges of the Baltic Fleet. With a high probability, the frigate is being tested after the work. The reason for placing the ship for repair work is not called..

Work to restore the technical readiness of the frigate “Admiral Gorshkov” completed by the Kronstadt Marine Plant- quotes TASS source words.

“Admiral Gorshkov” is the lead frigate of the project 22350. It is designed for combat operations in the far and near sea zones., and also to participate in solving problems in the area of ​​ocean. ship's displacement is about 4500 t, the maximum length – about 130 m, maximum width – over 16m. Cruising range – more 4000 miles, seaworthiness – no limits.

Built in a shipyard “Severnaya Verf” in St. Petersburg, joined the Northern Fleet in July 2018 of the year.

weaponry: 130-mm artillery unit A-192, air defense missile system “Redoubt”, universal launcher UKSK 3S14 on 16 anti-ship missiles “Caliber”or “onyx”, anti-submarine complex “Pack-NK”, antisubmarine helicopter Ka-27.

A source

                          
Chat in TELEGRAM:  t.me/+9Wotlf_WTEFkYmIy

Playmarket

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 comment
Inline Feedbacks
View all comments