military experts
EnglishРусский中文(简体)FrançaisEspañol
Set as default language
 Edit Translation

The third serial MRK “storm” project 22800 launched

Today, in the Leningrad Region in the shipyard “Pella” It was launched a small rocket ship project 22800 “storm”, TASS reports.

Третий серийный МРК "Буря" проекта 22800 спущен на воду

At the solemn ceremony of launching the ship into the water Shipbuilding deputy head of the Russian Navy Captain 1st Rank Mikhail Krasnopeev on behalf of the Chief of the Russian Navy, Admiral Vladimir Korolev expressed gratitude to the staff of the enterprise.

RCM “storm” project 22800 It was laid on “Pelle” December 2016 of the year. According to the plans of the Russian Navy shipbuilders and ship should proceed to the factory and sea trials 2019 year, and 2020 become part of the Russian fleet. “storm” It is the fourth ship of the project and the third serial, under construction on the SSP “Pella”. Overall, the Russian Navy plans to commission at least 18 IRC project.

On “cask”, as in the second series “squalene”, nominally set a new ship's air defense missile-gun system “Carapace M” development JSC “KBP Instrument Design Bureau”. on the head “hurricane” and the first batch “typhoon” SAM “Carapace M” not installed, they used 30-mm gun mounts AK-630.

ship project 22800 “Karakuri” It has an overall length 65 m with a maximum width 10 m and normal cake 4 m. displacement - 800 t. The maximum speed on the level of progress 30 knots. Cruising range at economical speed - up 2500 nautical miles. autonomy 15 days. Intended for combat operations in the near sea zone. primary weapon – missile system “Caliber”.

                          
Chat in TELEGRAM:  t.me/+9Wotlf_WTEFkYmIy

Playmarket

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 comment
Inline Feedbacks
View all comments